ER308H Stainless Steel Argon-arc Welding Wire

1. Protective gas: pure Ar; flow rate: 9-14L/min when the current is 100-200A, 14-18L/min when the current is 200-300A. 2. Tungsten electrode extension length: 3-5mm; arc length: 1-3mm. 3. The wind speed is limited to ≤1.0m/s; it is recommended to pass argon protection on the back of the welding area. 4. In welding, the magnitude of the welding line energy directly affects the mechanical properties and crack resistance of the weld metal, and more attention should be paid to it. 5. Make sure to remove the rust layer, moisture, oil, dust, etc. on the welding part.

Products Details

It is used for the welding of 12Cr18Ni9 (SUS 302), 06Cr19Ni10 (SUS 304) type austenitic stainless steel and similar base metals, and is also often used for the welding of thin plates.

Model

Welding wire chemical compositionWt%)

 

C

Mn

Si

Cr

Ni

Mo

P

S

Cu

ER308H

0.050

1.79

0.48

19.72

9.40

0.005

0.022

0.013

0.06

Compliant (equivalent) standard model

An example of physical properties of deposited metal (with SJ601)

GB

AWS

Tensile StrengthMPa

Elongation%

S308H

ER308H

590

40.5

Diameter(mm)

¢1.6

¢2.0

¢2.5

¢3.2

Welding current(A)

50-100

100-200

200-300

300-400

Wire diameter

¢1.6

¢2.0

¢2.5

Package weight

5Kg/plastic box,20Kg/carton(Contains 4 small plastic boxes)

1. Protective gas: pure Ar; flow rate: 9-14L/min when the current is 100-200A, 14-18L/min when the current is 200-300A. 2. Tungsten electrode extension length: 3-5mm; arc length: 1-3mm. 3. The wind speed is limited to ≤1.0m/s; it is recommended to pass argon protection on the back of the welding area. 4. In welding, the magnitude of the welding line energy directly affects the mechanical properties and crack resistance of the weld metal, and more attention should be paid to it. 5. Make sure to remove the rust layer, moisture, oil, dust, etc. on the welding part. The above suggestions are for reference only, and the actual situation shall prevail in the specific operation. If necessary, process qualification should be carried out before determining the welding plan.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours